As soon as Locomotive Pulling train was arriving at Katakami Station, They shunt carriage by specal way.


Track plan at Katakami St.

1.Disconnect D.L at the top of train. And disconnect D.C. at the back of train.

2.D.C move to LocoHouse, and D.L connect to opposite side of P.C.

3.Push and leaving. Running behind and disconnect P.C.

4.D.L. Stops

5.P.C. was running alone.

6.Later P.C. was stopped by Hand Brake
No photos
All photos were taken on 30.6.1991


Return to Katakami Railway page

Return to my Homepage
haru@mathpro.it.okayama-u.ac.jp